Case Study: USA Federal Credit Union
Project Scope: Run Outside Plant Cable (OSP) from building to building for an ATM Machine.
Project Scope: Run Outside Plant Cable (OSP) from building to building for an ATM Machine.Schedule: 1 Day
Critical Business Issue: Out of state ATM Vendor on-site for installation day only. No cable path known to get cable outside U.S. Navy base convenience store to neighboring building.
Capabilities:
- Project Management
- Situation Analysis / Engineering
- Horizontal Cabling
- BICSI ANSI/TIA/EIA Compliance Review
Results:
- Identified optimum route for cable path
- Met one-day ATM Vendor schedule
- ATM installed on-schedule, within budget
Services include...
• Horizontal Structured Cabling
• Riser cabling
• Data Center Design
• Fiber Optic cabling
• Cross Connect Wiring
• Patch Cord Installation
• TIA/EIA Compliance
• Sound Masking
• Horizontal Structured Cabling
• Riser cabling
• Data Center Design
• Fiber Optic cabling
• Cross Connect Wiring
• Patch Cord Installation
• TIA/EIA Compliance
• Sound Masking
Case studies...
We've helped our Customers with their Cable & Fiber, and we'd like to share with you how.
• Cardinal Health
• USA Federal Credit Union
• L-3 Communications
Frequently asked...
Click here to read the questions we hear most about Cable & Fiber.
Looking for an answer you can't find? Send us an email.